Mark chargers, cable runs and supplies straight onto site photos. Cable sizing, volt drop and load checks run as you draw; the customer quote and DNO pack are ready before you leave.
Photograph the cut-out, board and route. Set a scale reference per photo. The site walk captures everything the office needs.
Drop chargers, draw cable runs, place boards and supplies. Cable sizing, volt drop and load-vs-main-fuse checks run as you draw.
Branded customer quote, engineer pack with single-line diagram, and the DNO application, exported as PDF before you leave.
Every plan includes the lot: no modules, no per-feature add-ons.
Every cable you draw is sized and checked against BS 7671 as you go. No spreadsheet on the bonnet of the van.
EV Site Planner assists design decisions; the final design and certification remain with the qualified installer.
EV Site Planner is built and used by a practising UK installer. The checks, the forms, the defaults: they're the ones we use on our own jobs, not a dev's guess at what the trade needs.
Most council estates were installed before the Public Charge Point Regulations 2023, before PAS 1899, and before LEVI due diligence started asking about the sites you already own. Review every site against every framework (payment, electrical, accessibility, highways and grant conditions) and turn the findings into a grant-readiness report.
Surveys are carried out on the ground by our installer network, in the same tool they already use.
Both installer plans get the full toolkit: canvas, checks, quotes, courses, guides and Project Support. 14-day trial, then paid. Prices exclude VAT.
Winning one extra domestic job pays for a year of Solo. Trials run on the full product; no card up front.